Warri Refinery Quick Fix Project

Several Subcontract Projects were executed by Us, works ranging from Mechanical to Piping and including equipments such as Air Fin Coolers and Heat Exchangers

Warri Refinery and Petrochemical Company

Pipe replacement in FCC Unit (5Nos 24" Lines, 4Nos 8: lines and 5Nos Drain/TSV lines) in 2019.

KRPC

10-C-01 Integrity checks and repairs in 2015, Cutting and replacement of Service Airline 4" AS-16101-B111 Area 111 Fuel plant in 2015.

Warri Refinery and Petrochemicals Company

Removal, Fabrication and Installation of Damaged lines for 10-H, 12-H and 15-H series after the fire incident of Area 1 in 2014. Also the Erection of Scaffolds, Fabrication and Tie-in on 3" Light oil line, Gasket repladcement on a 24" valve mounted on MP Steam Header.

WRPC

Demolition of a section of the Jetty collapsed Bridge (left of the Transversing pipes) in 2013. Emergency Dropping of 12-R-01 Plug valve of defective lines 12-D-01 reforming Unit in 2013.

WRPC

Fabrication and Installation of 8" Product pipeline from TK-103 to the WRPC Jetty in 2016. Installation of two new complete Heat Exchanger Shell and Tube Bundles for 16-E-01A/B in FCC unit in 2018.